For this project, we were chosen to work in partnership with Granada and ISG to deliver a whole office building comprising 14 floors, 4 elevations with 91 windows per floor totalling 1274 windows to be refurbished with Secondary Glazing.
The existing primary windows were single glazed steel windows with 4mm float glass with protective timber trip bars. Being single-glazed units, it made the building quite cold in the winter months, so the goal of the Secondary Glazing installation was to create a warmer and more appealing environment for existing and new clients within the building.
The primary windows were mostly all identical non-functional primary windows, with an arched top. Which meant our recommendation to the client was to use a lift out secondary glazing system. The lift-out system is one of the most cost-effective Secondary Glazing systems, as it has no moving parts or hinges to manufacture. It is however only practical in situations where access to the primary window isn’t necessary, as it would involve completely removing the Secondary Glazing glass panels to do so.